THE UK LEADER IN INFRARED HEATING

Herschel Heritage Videos

Discover our collection of Herschel Heritage videos and look inside a number of church Halo installations as well as our UK Production Facility to see how and where our Halo infrared heating range is manufactured. Listen to feedback from key stakeholders, the team from the Everything Electric Show and the Herschel team and look back into how the Halo proposition came about and the potential it offers for delivering net zero heating across the Heritage sector.

From 4-5 days warm up time with gas to just 30 minutes with Halo

Churchwarden Andrew Bellamy talks about his experience with using Herschel Halo heaters compared to the old boiler system in St Michael’s Church, Aynho.

Read Case Study

Halo install shows significant energy savings in Church heating

This 7 minute will take you through St Matthews Church experience with the Halo, and the significant energy savings they have experienced over the coldest months, while using the Halo to heat their Sunday Services.

Read Case Study

Halo serves a dual-purpose in beautiful Lady Chapel installation

See how the Halo heater provides a solution offering comfortable warmth and also illuminates the Lady Chapel with its integrated lights in All Saints’ Church, Martock.

Read Case Study

As Featured on Everything Electric Show

Watch as the team at Everything Electric visit St Matthew’s Church, All Saints Church, and Herschel’s UK Production Facility to discuss how the Herschel Halo is the perfect sustainable heating solution for heritage buildings.

Herschel Halo

The Ultimate Church Heating Solution

The Herschel Halo is a highly innovative, zero light specialist infrared heater that is designed to provide heritage buildings with a net zero heating solution.

Herschel Halo

Building the Herschel Halo

Step inside Herschel’s state-of-the-art UK Production Facility and see the precision engineering and manufacturing expertise that combine to create the Herschel Halo heater.

Plus read all about our UK Production Facility, opened in May 2023 by Darren Jones MP, and see a number of videos from Darren and our other guest speakers on the link below.

UK Production Facility Grand Opening

Building Bespoke Halos for St Paul's Cathedral

Step inside Herschel’s UK Production Facility and see the design/manufacturing process of building the completely bespoke Halo heaters for St Paul’s Cathedral in Melbourne, Australia.

The design of the Halo heaters beautifully incorporates the cathedral’s iconic symbols. From the bespoke icons on the panels to the custom decorative grill, every part of the Halo has been thoughtfully designed to blend in perfectly with the Cathedral interior.